BRU Facility – Bromine recovery unit

Turnkey project for collecting and burning the organic waste of BCL through a top fired static incinerator and recover heat via a water tube steam boiler fit for waste incineration (large radiation zone, design for aggressive media flowing through and high dust load).

ICL Industrial Products – BCL Israel Project Value: $10,300,000